GEMTEC Photo Gallery

Click on each of the images below to enlarge.

Thumbnail
Sampling Petitcodiac River silt using our Borros Piston sampler for EIA study
Thumbnail
Plate load testing for granular wind turbine foundation pad, Dorchester Penitentiary
Thumbnail
PDA testing for Miller Brook Marginal wharf, Miller Brook, New Brunswick
Thumbnail
Mechanically stabilized earth retaining wall construction for Mapleton Fashion Centre, Moncton New Brunswick
Thumbnail
Preparing pile for PDA test at Canadian Tire Truro, Nova Scotia
Thumbnail
Electrofishing along stream adjacent to CN main rail line, Springhill Junction, Nova Scotia
Thumbnail
Retaining wall rehabilitation using geogrid and mechanical connection, Riverview, New Brunswick
Thumbnail
Geotechnical investigation on Richibucto harbor for proposed breakwater extension
Thumbnail
Geotechnical drill rig at edge of Petitcodiac River in Dieppe, New Brunswick for EIA study
Thumbnail
Retrieving undisturbed block sample of clay for laboratory testing, Amherst Lagoon, Amherst, Nova Scotia
Thumbnail
Slope stabilization along CN main rail line, Tantramar River, Sackville, New Brunswick
Thumbnail
Coring concrete base on one of the seven piers for the new Petitcodiac River bridge, Moncton, New Brunswick
Thumbnail
Surface water sampling, Corbett Brook, New Brunswick
Thumbnail
Fish rescue, Fredericton, New Brunswick
Thumbnail
Slope stability assessment, CN rail line, Edmundston, New Brunswick
Thumbnail
Flood damage assessment, CN rail line, Edmundston, New Brunswick
Thumbnail
Heating oil spill clean-up, Moncton, New Brunswick
Thumbnail
Rock slope stability assessment, Fundy Parkway, New Brunswick
Thumbnail
Vegetation Assessment, Northern New Brunswick
Thumbnail
Wetland Delineation as part of an Environmental Impact Assessment, Northern New Brunswick
Thumbnail
Wetland Functional Assessment in central New Brunswick
Thumbnail
Newcastle Creek temporary crossing corrugated steel culvert pipes
Thumbnail
NB Coal 8200 Marion walking dragline viewed during rock fill placement
Thumbnail
Spring 2008 flooding on the Saint John River in Maugerville, NB
Thumbnail
Placing temporary fish isolation netting and piers in Newcastle Creek
Thumbnail
Placing temporary culverts in Newcastle Creek
Thumbnail
GEMTEC truck parked beside NB Coal 8200 Marion walking dragline
Thumbnail
Newcastle creek temporary dragline crossing. GEMTEC truck parked next the dragline bucket.